01 · Scope

Pre-deployment site inspection

Capture enough evidence to make a defensible ParkPower installation recommendation and budget estimate.

02 · Electrical

Supply, capacity and switchboards

Electrical conclusions must be reviewed by a licensed electrician. Record observations and source documents, not assumptions.

Boards and circuits

Map breaker → served outlets/bays and record available ways.

03 · Physical works

Outlets, cable routes and metering

Measure realistic routes, including rises, drops, bends, penetrations and service loops.

Outlet / bay schedule

One row per proposed or existing outlet.

Cable route schedule

Measure each distinct run.

Photo evidence

Switchboards, breaker labels, outlet locations, cable routes, APs and server location. Maximum 30 photos.

04 · Connectivity

Wi‑Fi, internet, BLE and data cabling

Test at proposed meter locations. Reception at the office is not evidence of meter coverage.

Coverage tests

Record actual location, distance and result.

05 · Operations

Platform, server and billing model

Define who operates the system and how energy charges move from readings to payment.

Accepted charging methods

06 · Commercial estimate

Indicative installation model

Adjust rates for the site. This is a planning estimate, not an electrical quotation.

Estimated project

$0
Ongoing platform$0 / month

07 · Recommendation

Readiness, risks and sign-off

State what is known, what remains conditional and who must validate it.

Risks and actions

Assign an owner and required resolution.

Complete the inspection

You can export a copy now and continue editing after submission.